Runway Resurface & Drainage Design Project

The project has recently commenced, with the engineering and environmental consultants GHD visiting the Island.

Part of GHD’s work is to present a number of concept designs to the community for discussion and feedback, before finalising the design of the preferred option. The community consultation is likely to occur in August 2014.

We are aware that many Island residents take the opportunity to leave the Island for a period of time during winter. However, we would like to be able to have input from as many residents as possible.

If you are likely to be away during August 2014, and would like to participate in the consultation process, please provide an email or postal address for the period you are away and we will send the information to you. Please contact the Board on (02) 6563 2066 or administration@lhib.nsw.gov.au to provide your contact details.