LHI Runway Closures June-July 2015

The Lord Howe Island Board are undertaking resurfacing and drainage works at the Lord Howe Island Aerodrome during the months of June, July and August 2015.

There will be periods of runway closure as well as Time Limited Works that will require pilots to give the Lord Howe Island Board up to 60 minutes prior notice of intention to land.

The closures, in local time (UTC + 10.5) will be:

08 June to 14 June: 0600 - 1200 (Local Time)

15 June to 18 June: Inclusive, 24 Hours

22 June to 25 June: Inclusive, 24 Hours

29 June to 02 July: Inclusive, 24 Hours

06 July to 09 July: Inclusive, 24 Hours (Wet weather contingency)

The runway will not be available to aircraft during these periods.

A Method of Work Plan, YLHI 01/2015, has been prepared for the works.

Download: Method of Work Plan YLHI 01/2015 (PDF) (470.66 KB)